Disc/Drum Front Disc Rear Brake Proportioning Valve Universal PV2c - Compatible with GM Street Rod Classic Car and Truck Chrome

US$25.00
1-4 Pieces
US$20.00
5-19 Pieces
US$18.00
20+ Pieces
Port:
Shanghai, China
Production Capacity:
500000000PCS/Year
Payment Terms:
T/T, Western Union, Paypal

Last Login Date:

Apr 03, 2023

Business Type:

Trading Company

Main Products:

Oil Drain Plug, Oil Drain Plug Gasket, Crush Washer, Sump Plug

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
PV2C
After-sales Service
12 Monthes
Warranty
12 Monthes
Car Make
Universal
Fuel
Gasoline
Body Material
Steel
Component
Fuel Filler Cap
Certification
ISO9001
Stroke
4 Stroke
Cylinder
Multi-cylinder
Fuel Saver Type
Magnet
Carburettor Type
Downdraft
Trademark
BM Automotive
Transport Package
PE Bag+Carton
Specification
Customized
Origin
China
HS Code
7415210000

Product Description

Product Description

 
  • Disc/Drum Front Disc Rear Brake Proportioning Valve Universal PV2C
  • Compatible with GM Street Rod Classic Car and Truck Chrome
  • Exact Copy of AC Delco Style - PV2 172-1353 (Disc-Drum) Valves and is a Universal PV2C Combination-Proportioning Valve, Disc/Drum Brakes
  • Compatibility - OEM dual-reservoir type master cylinders. Compatibility - Brake line ports are 1/2'' and 7/16''
  • Durability - The valve is made in brass for heavy duty and long lasting features with chrome finish

Company Profile

Packaging & Shipping

FAQ

1. How can I get sample?
1) Sample fee will be free if we have in stock, you just need to pay the shipping cost is OK.
2) The sample of your own design needs to pay for the mold set up charge, Samples production takes 5-7 working days after set up charge received & size drawing approval.
2. How can I get the quotation?
1) Detailed drawings ( CAD/PDF/DWG/IGS/STEP/JPG files available )
2) Material requirement.
3) Surface treatment.
4) Quantity (per order/per month/annual).
5) Any special demands or requirements, such as packing, labels,delivery,etc.
3. How to pay for the order?
1) ****** Trade Assurance
2) Paypal
3) TT
4) L/C
4. What's the lead time?
Sample: within 10 days.
Mass Production: within 10-25 days after payment down.
Rush Services AvailableSample: within 10 days.
5. What is the shipping method?
Most of the goods were sent out by international airway express company like DHL, UPS, FedEx, TNT.
Usually takes around 3-5 working days (door to door service), We also can arrange shipment via seaway.
6. I want to keep our design in secret, can we sign NDA?
Sure, we will not display any customers' design or show to other people, we can sign NDA.

 

Send your message to this supplier
Mr. Timothy

Post a Sourcing Request Now

People who liked this also liked