Oil Drain Plug Standard M16.4-1.33 Replace for 090-039CD, 65235, 11128-69200, 11128-U8000 Fit for Nissan, Volvo

US$2.00
100-499 Pieces
US$1.50
500-2,999 Pieces
US$1.00
3,000+ Pieces
Port:
Shanghai, China
Production Capacity:
500000000PCS/Year
Payment Terms:
T/T, Western Union, Paypal

Last Login Date:

Apr 03, 2023

Business Type:

Trading Company

Main Products:

Oil Drain Plug, Oil Drain Plug Gasket, Crush Washer, Sump Plug

Product Description

Company Info

Basic Info.

After-sales Service
12 Monthes
Warranty
12 Monthes
Car Make
Nissan
Fuel
Gasoline
Body Material
Steel
Component
Fuel Filler Cap
Certification
ISO9001
Stroke
4 Stroke
Cylinder
Multi-cylinder
Fuel Saver Type
Magnet
Carburettor Type
Downdraft
Trademark
BM Automotive
Transport Package
PE Bag+Carton
Specification
Customized
Origin
China
HS Code
7616100000

Product Description

Product Description

  • Thread Size: M16.4-1.33 Shank Length:12mm/ 0.472 In. Head Size: 21mm
  • Aftermarket Replace for 090-039, 65235, 11128-69200, 11128-U8000
  • Ensure fit - To Make Sure This Part Fits Your Exact Vehicle
  • Easy To Install - Our Plug Will Intall In Place Of Your Current Drain Plug

Product NameOil Drain Plug
 
Model NoBM 0010
LogoCustom Logo
Place of ProductZhejiang China
Applicablefor Nissan,Volvo
PackagePlastic case
 
ServiceOEM ODM
 
Delivery time7-10days
CertificateIso9001
Company Profile

Packaging & Shipping

FAQ

1. How can I get sample?
1) Sample fee will be free if we have in stock, you just need to pay the shipping cost is OK.
2) The sample of your own design needs to pay for the mold set up charge, Samples production takes 5-7 working days after set up charge received & size drawing approval.
2. How can I get the quotation?
1) Detailed drawings ( CAD/PDF/DWG/IGS/STEP/JPG files available )
2) Material requirement.
3) Surface treatment.
4) Quantity (per order/per month/annual).
5) Any special demands or requirements, such as packing, labels,delivery,etc.
3. How to pay for the order?
1) ****** Trade Assurance
2) Paypal
3) TT
4) L/C
4. What's the lead time?
Sample: within 10 days.
Mass Production: within 10-25 days after payment down.
Rush Services AvailableSample: within 10 days.
5. What is the shipping method?
Most of the goods were sent out by international airway express company like DHL, UPS, FedEx, TNT.
Usually takes around 3-5 working days (door to door service), We also can arrange shipment via seaway.
6. I want to keep our design in secret, can we sign NDA?
Sure, we will not display any customers' design or show to other people, we can sign NDA.

 

Send your message to this supplier
Mr. Timothy

Post a Sourcing Request Now

People who liked this also liked